Fulp Hall 5th Floor Renovation
Fulp Hall on Tri-County Technical College Pendleton campus was constructed in 1996 and is the main classroom building for the Health Sciences. By reconfiguring an existing faculty office suite on the fifth floor, a laboratory suite with two interconnected labs, a prep room, chemical storage, and other support spaces emerged. These spaces are together treated as a control area for the determination of maximum quantities of hazardous materials that may be used or stored inside. The project upgrades mechanical, electrical, and plumbing systems in conformance with current code requirements.
Tri County Technical College
Pendleton, SC
Completion Date
2020